IS WORK OVER?

Automation index

How much of a Interpreter’s job can AI already do?

A glossary and a prep pack come earlier. Speaking at the same time as the other person, in a room, does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Interpreter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Prep glossaries, briefings and corpora.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Translate support documents for the event.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Interpret simultaneous or consecutive in the room.
Estimate

No public source provides a precise figure. This is our estimate.

24%12%+2.9
Manage fatigue, booth and handover.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Ethics, confidentiality and live correction.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Clients, credentials and specialism.
Estimate

No public source provides a precise figure. This is our estimate.

12%18%+2.2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • translate texts
  • interpret
  • proofread translations
  • Prep glossaries, briefings and corpora
  • Manage fatigue, booth and handover
  • Clients, credentials and specialism
  • interprete
  • interpretacion simultanea

Sources for this job· O*NET 27-3091.00· ESCO/ISCO 2643

Concrete finisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, joints and thickness.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pour, vibrate and float.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Screed, power float and the right moment.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Cure, polythene and the windy day.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The late mixer and the one who wants water.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it does not crack open, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pour concrete
  • vibrate
  • float
  • shrinkage joints
  • power float
  • cure
  • screed
  • slab thickness

Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 266Nurse24%
  2. 267Nuclear engineer24%
  3. 268Health inspector24%
  4. 270Warehouse supervisor24%
  5. 271Jeweller24%
  6. 272Intercultural mediator24%