Automation index
How much of a Inventory clerk’s job can AI already do?
A cycle count comes earlier. Matching what is there to what the system says do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Inventory clerk
28%
AI can already do 28% of this job.
#105 / 733
View rankingInventory clerk
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Count, locations and the adjustment.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Floor, the gap and what is in the aisle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, shrink and the reason.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Audit, the auditor and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the blind count and the stopped warehouse.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Match for real, and not adjusting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cycle count
- adjust stock
- locations
- shrink
- blind count
- stock audit
- gaps
- variance reasons
Sources for this job· O*NET 43-5081.00· ESCO/ISCO 4321
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142