Automation index
How much of a Inventory clerk’s job can AI already do?
A cycle count comes earlier. Matching what is there to what the system says do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Inventory clerk
28%
AI can already do 28% of this job.
#105 / 623
View rankingInventory clerk
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Count, locations and the adjustment.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Floor, the gap and what is in the aisle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, shrink and the reason.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Audit, the auditor and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the blind count and the stopped warehouse.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Match for real, and not adjusting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cycle count
- adjust stock
- locations
- shrink
- blind count
- stock audit
- gaps
- variance reasons
Sources for this job· O*NET 43-5081.00· ESCO/ISCO 4321
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142