IS WORK OVER?

Automation index

How much of a Inventory clerk’s job can AI already do?

A cycle count comes earlier. Matching what is there to what the system says do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Inventory clerk

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Count, locations and the adjustment.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Floor, the gap and what is in the aisle.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, shrink and the reason.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Audit, the auditor and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, the blind count and the stopped warehouse.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Match for real, and not adjusting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cycle count
  • adjust stock
  • locations
  • shrink
  • blind count
  • stock audit
  • gaps
  • variance reasons

Sources for this job· O*NET 43-5081.00· ESCO/ISCO 4321

Drafter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, dimension and issue sheets.
Estimate

No public source provides a precise figure. This is our estimate.

20%48%+9.6
Quantities, legends and revisions.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Coordinate with architect, engineer and site.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Drawing standards, stamps and issue.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Archive, BIM and clashes.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not issuing a drawing nobody can read.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model, dimension and issue sheets
  • Quantities, legends and revisions
  • Drawing standards, stamps and issue
  • Archive, BIM and clashes
  • Not issuing a drawing nobody can read
  • delineante
  • proyectista
  • drafter
  • cad technician

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 102Industrial engineer28%
  2. 103Site reliability engineer28%
  3. 104Tax inspector28%
  4. 106Store manager28%
  5. 107Government lawyer28%
  6. 108Mathematician28%