Automation index
How much of a Inventory clerk’s job can AI already do?
A cycle count comes earlier. Matching what is there to what the system says do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Inventory clerk
28%
AI can already do 28% of this job.
#105 / 623
View rankingInventory clerk
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Count, locations and the adjustment.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Floor, the gap and what is in the aisle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, shrink and the reason.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Audit, the auditor and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the blind count and the stopped warehouse.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Match for real, and not adjusting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cycle count
- adjust stock
- locations
- shrink
- blind count
- stock audit
- gaps
- variance reasons
Sources for this job· O*NET 43-5081.00· ESCO/ISCO 4321
IS WORK OVER?
Process engineer
26%
#205 / 623
View rankingProcess engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
P&IDs, balances and the operating procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, trials and the real bottleneck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, yields and the improvement report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Start-up, shutdown and the shift that skips the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Process safety and the HAZOP that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not overloading the reactor, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- P&IDs
- mass balances
- HAZOP
- plant start-up
- improve yields
- SOP
- bottlenecks
- process safety
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141