Automation index
How much of a Irrigation technician’s job can AI already do?
A controller comes earlier. Watering the block without drowning the field do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Irrigation technician
22%
AI can already do 22% of this job.
#450 / 713
View rankingIrrigation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, controller and the sector.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Dripper, valve and the leak you cannot see.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Filters, fertigation and the blockage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Field, pressure and the one that does not reach the end.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The drought, the water turn and not fighting the flow.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The block watered, and not drowning it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- irrigation controllers
- drippers
- sectors
- fertigation
- valves
- filters
- field pressure
- water turns
Sources for this job· O*NET 45-2091.00· ESCO/ISCO 6114
IS WORK OVER?
Army officer
22%
#402 / 713
View rankingArmy officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Order, the map and the section.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the one who lags and the one who jumps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Live fire, safety and not playing brave.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Logistics, the meal and the one that does not arrive.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Command, the pressure and not dressing casualties.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Get them all out, and not losing one.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- operations orders
- sections
- the map
- live fire
- meals
- casualties
- command
- field safety
Sources for this job· O*NET 55-1015.00· ESCO/ISCO 0110