Automation index
How much of a Irrigation technician’s job can AI already do?
A controller comes earlier. Watering the block without drowning the field do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Irrigation technician
22%
AI can already do 22% of this job.
#393 / 633
View rankingIrrigation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, controller and the sector.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Dripper, valve and the leak you cannot see.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Filters, fertigation and the blockage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Field, pressure and the one that does not reach the end.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The drought, the water turn and not fighting the flow.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The block watered, and not drowning it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- irrigation controllers
- drippers
- sectors
- fertigation
- valves
- filters
- field pressure
- water turns
Sources for this job· O*NET 45-2091.00· ESCO/ISCO 6114
IS WORK OVER?
Miner
16%
#606 / 633
View rankingMiner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, blast plans and sensors.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Logged maintenance and mine CMMS.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Drill, load and extract.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 10% | +2.4 |
Support, ventilation and water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, gases and evacuation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Shift, partner and not getting casual.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, blast plans and sensors
- Logged maintenance and mine CMMS
- Drill, load and extract
- Support, ventilation and water
- Safety, gases and evacuation
- Shift, partner and not getting casual
- minero
- miner
- interior de mina
Sources for this job· O*NET 47-5041.00· ESCO/ISCO 8111