IS WORK OVER?

Automation index

How much of a Irrigation technician’s job can AI already do?

A controller comes earlier. Watering the block without drowning the field do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Irrigation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, controller and the sector.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Dripper, valve and the leak you cannot see.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Filters, fertigation and the blockage.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, pressure and the one that does not reach the end.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The drought, the water turn and not fighting the flow.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The block watered, and not drowning it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • irrigation controllers
  • drippers
  • sectors
  • fertigation
  • valves
  • filters
  • field pressure
  • water turns

Sources for this job· O*NET 45-2091.00· ESCO/ISCO 6114

Piling operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and each pile’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, bore and refusal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cage, pour and the tube that rides up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vibration, the neighbour and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Plant, access and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
To level, and not cracking party walls.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive piles
  • bore
  • cages
  • refusal level
  • site vibration
  • pour piles
  • piling set-out
  • recoverable tubes

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 390Environmental technician22%
  2. 391Metrology technician22%
  3. 392Waste technician22%
  4. 394Semiconductor technician22%
  5. 395Telephony technician22%
  6. 396Orthotic and prosthetic technician22%