IS WORK OVER?

Automation index

How much of a Irrigation technician’s job can AI already do?

A controller comes earlier. Watering the block without drowning the field do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Irrigation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, controller and the sector.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Dripper, valve and the leak you cannot see.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Filters, fertigation and the blockage.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, pressure and the one that does not reach the end.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The drought, the water turn and not fighting the flow.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The block watered, and not drowning it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • irrigation controllers
  • drippers
  • sectors
  • fertigation
  • valves
  • filters
  • field pressure
  • water turns

Sources for this job· O*NET 45-2091.00· ESCO/ISCO 6114

Public health officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Surveillance, the indicator and the alert.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Outbreak, the questionnaire and the one who will not answer.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Field, the source and shutting the premises.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Report, the mayor and not softening the figure.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vaccination, coverage and the rumour.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Cut the outbreak, and not softening it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • epi surveillance
  • outbreaks
  • field questionnaires
  • shut premises
  • vaccine coverage
  • public-health alerts
  • mayors
  • not soften figures

Sources for this job· O*NET 21-1091.00· ESCO/ISCO 2263

Analyse my job

Jobs with similar scores

  1. 408Environmental technician22%
  2. 409Metrology technician22%
  3. 410Waste technician22%
  4. 412Environmental health officer22%
  5. 413Public health officer22%
  6. 414Semiconductor technician22%