Automation index
How much of a Irrigation technician’s job can AI already do?
A controller comes earlier. Watering the block without drowning the field do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Irrigation technician
22%
AI can already do 22% of this job.
#490 / 763
View rankingIrrigation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, controller and the sector.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Dripper, valve and the leak you cannot see.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Filters, fertigation and the blockage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Field, pressure and the one that does not reach the end.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The drought, the water turn and not fighting the flow.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The block watered, and not drowning it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- irrigation controllers
- drippers
- sectors
- fertigation
- valves
- filters
- field pressure
- water turns
Sources for this job· O*NET 45-2091.00· ESCO/ISCO 6114
IS WORK OVER?
Requirements engineer
27%
#187 / 763
View rankingRequirements engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Workshop, the actor and the requirement.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Conflict, the loudest and not swallowing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Criterion, the test and not leaving it vague.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Change, the impact and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The project lead, the deadline and not cutting the one that matters.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it is needed, and not the loudest one's.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- requirements
- actor workshops
- acceptance criteria
- change impact
- backlog
- tests
- not swallow the loudest
- ambiguity
Sources for this job· O*NET 15-1299.00· ESCO/ISCO 2511