Automation index
How much of a Irrigation technician’s job can AI already do?
A controller comes earlier. Watering the block without drowning the field do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Irrigation technician
22%
AI can already do 22% of this job.
#393 / 633
View rankingIrrigation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, controller and the sector.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Dripper, valve and the leak you cannot see.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Filters, fertigation and the blockage.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Field, pressure and the one that does not reach the end.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The drought, the water turn and not fighting the flow.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
The block watered, and not drowning it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- irrigation controllers
- drippers
- sectors
- fertigation
- valves
- filters
- field pressure
- water turns
Sources for this job· O*NET 45-2091.00· ESCO/ISCO 6114
IS WORK OVER?
SEM specialist
28%
#97 / 633
View rankingSEM specialist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Campaigns, keywords and Quality Score.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Landing, tracking and the conversion that misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The client who wants more clicks for less.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Reports, copy and the ad A/B.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Legal, brands and the claim you cannot make.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Spend on buyers, and not inflating impressions.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- SEM campaigns
- keywords
- Quality Score
- landings
- conversion tracking
- ad A/B
- Google Ads
- media budget
Sources for this job· O*NET 13-1161.00· ESCO/ISCO 2431