IS WORK OVER?

Automation index

How much of a Irrigation technician’s job can AI already do?

A controller comes earlier. Watering the block without drowning the field do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Irrigation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, controller and the sector.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Dripper, valve and the leak you cannot see.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Filters, fertigation and the blockage.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, pressure and the one that does not reach the end.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The drought, the water turn and not fighting the flow.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The block watered, and not drowning it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • irrigation controllers
  • drippers
  • sectors
  • fertigation
  • valves
  • filters
  • field pressure
  • water turns

Sources for this job· O*NET 45-2091.00· ESCO/ISCO 6114

Zoologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Census, marks and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the sign and the one that does not show.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Data, the model and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Report, the works and the corridor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The storm, the nest and not getting close.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Follow, and not disturbing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • censuses
  • signs
  • marks
  • corridors
  • nests
  • field protocols
  • population models
  • works

Sources for this job· O*NET 19-1023.00· ESCO/ISCO 2131

Analyse my job

Jobs with similar scores

  1. 390Environmental technician22%
  2. 391Metrology technician22%
  3. 392Waste technician22%
  4. 394Semiconductor technician22%
  5. 395Telephony technician22%
  6. 396Orthotic and prosthetic technician22%