Automation index
How much of a IT auditor’s job can AI already do?
A log sample and a stock finding come earlier. Judging the control and signing the report do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
IT auditor
32%
AI can already do 32% of this job.
#27 / 623
View rankingIT auditor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan scope, IT risks and sampling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Review access, changes, logs and configs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 52% | +8.3 |
Document findings, evidence and recommendations.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Interview, challenge the auditee and apply judgement.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Follow up action plans and retest.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, committee and liability for the opinion.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 32% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- audit systems
- review logs
- assess IT controls
- test access
- document findings
- audit changes
- retest controls
- sign the audit report
Sources for this job· O*NET 15-1212.00· ESCO/ISCO 2519
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142