IS WORK OVER?

Automation index

How much of a IT auditor’s job can AI already do?

A log sample and a stock finding come earlier. Judging the control and signing the report do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

IT auditor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan scope, IT risks and sampling.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Review access, changes, logs and configs.
Estimate

No public source provides a precise figure. This is our estimate.

16%52%+8.3
Document findings, evidence and recommendations.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Interview, challenge the auditee and apply judgement.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Follow up action plans and retest.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Report, committee and liability for the opinion.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%32%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • audit systems
  • review logs
  • assess IT controls
  • test access
  • document findings
  • audit changes
  • retest controls
  • sign the audit report

Sources for this job· O*NET 15-1212.00· ESCO/ISCO 2519

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Analyse my job

Jobs with similar scores

  1. 24Warehouse operator33%
  2. 25Actuary32%
  3. 26Cybersecurity analyst32%
  4. 28Lawyer31%
  5. 29Admin assistant31%
  6. 30Biologist31%