Automation index
How much of a IT auditor’s job can AI already do?
A log sample and a stock finding come earlier. Judging the control and signing the report do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
IT auditor
32%
AI can already do 32% of this job.
#27 / 733
View rankingIT auditor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan scope, IT risks and sampling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Review access, changes, logs and configs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 52% | +8.3 |
Document findings, evidence and recommendations.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Interview, challenge the auditee and apply judgement.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Follow up action plans and retest.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, committee and liability for the opinion.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 32% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- audit systems
- review logs
- assess IT controls
- test access
- document findings
- audit changes
- retest controls
- sign the audit report
Sources for this job· O*NET 15-1212.00· ESCO/ISCO 2519
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142