Automation index
How much of a IT auditor’s job can AI already do?
A log sample and a stock finding come earlier. Judging the control and signing the report do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
IT auditor
32%
AI can already do 32% of this job.
#27 / 623
View rankingIT auditor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan scope, IT risks and sampling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Review access, changes, logs and configs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 52% | +8.3 |
Document findings, evidence and recommendations.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Interview, challenge the auditee and apply judgement.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Follow up action plans and retest.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, committee and liability for the opinion.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 32% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- audit systems
- review logs
- assess IT controls
- test access
- document findings
- audit changes
- retest controls
- sign the audit report
Sources for this job· O*NET 15-1212.00· ESCO/ISCO 2519
IS WORK OVER?
Renewables engineer
27%
#163 / 623
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149