Automation index
How much of a IT auditor’s job can AI already do?
A log sample and a stock finding come earlier. Judging the control and signing the report do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
IT auditor
32%
AI can already do 32% of this job.
#27 / 743
View rankingIT auditor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan scope, IT risks and sampling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Review access, changes, logs and configs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 52% | +8.3 |
Document findings, evidence and recommendations.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Interview, challenge the auditee and apply judgement.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Follow up action plans and retest.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, committee and liability for the opinion.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 32% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- audit systems
- review logs
- assess IT controls
- test access
- document findings
- audit changes
- retest controls
- sign the audit report
Sources for this job· O*NET 15-1212.00· ESCO/ISCO 2519
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142