Automation index
How much of a IVF laboratory technician’s job can AI already do?
A retrieval diary comes earlier. Identifying gametes without crossing couples do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
IVF laboratory technician
19%
AI can already do 19% of this job.
#650 / 743
View rankingIVF laboratory technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diary, the retrieval and the count.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Capacitation, the sample and the one that is not there.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Identify, the double check and not crossing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cryopreserve, the tank and the one that is lost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The embryologist, the rush and not rushing a tube.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not crossing couples. Ever.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- retrievals
- sperm capacitation
- double check
- cryopreservation
- nitrogen tanks
- identify gametes
- not cross couples
- oocyte count
Sources for this job· O*NET 29-2011.00· ESCO/ISCO 3212
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142