Automation index
How much of a IVF laboratory technician’s job can AI already do?
A retrieval diary comes earlier. Identifying gametes without crossing couples do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
IVF laboratory technician
19%
AI can already do 19% of this job.
#659 / 753
View rankingIVF laboratory technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diary, the retrieval and the count.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Capacitation, the sample and the one that is not there.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Identify, the double check and not crossing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cryopreserve, the tank and the one that is lost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The embryologist, the rush and not rushing a tube.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not crossing couples. Ever.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- retrievals
- sperm capacitation
- double check
- cryopreservation
- nitrogen tanks
- identify gametes
- not cross couples
- oocyte count
Sources for this job· O*NET 29-2011.00· ESCO/ISCO 3212
IS WORK OVER?
Site engineer
19%
#606 / 753
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142