Automation index
How much of a Junior developer’s job can AI already do?
Today an AI can already do 31% of this job. What’s left takes judgment, team context, and reading what never shows up on the ticket.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Junior developer
31%↓
AI can already do 31% of this job.
#38 / 623
View rankingJunior developer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Write, analyze, review, and rewrite programs, using workflow chart and diagram, and applying knowledge of computer capabilities, subject matter, and symbolic logic.EstimateNo public source provides a precise figure. This is our estimate. | 13% | 48% | +6.2 |
Write, update, and maintain computer programs or software packages to handle specific jobs such as tracking inventory, storing or retrieving data, or controlling other equipment.EstimateNo public source provides a precise figure. This is our estimate. | 11% | 28% | +3.1 |
Correct errors by making appropriate changes and rechecking the program to ensure that the desired results are produced.EstimateNo public source provides a precise figure. This is our estimate. | 11% | 28% | +3.1 |
Perform or direct revision, repair, or expansion of existing programs to increase operating efficiency or adapt to new requirements.EstimateNo public source provides a precise figure. This is our estimate. | 9% | 12% | +1.1 |
Conduct trial runs of programs and software applications to be sure they will produce the desired information and that the instructions are correct.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Consult with managerial, engineering, and technical personnel to clarify program intent, identify problems, and suggest changes.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 28% | +1.7 |
Develop Web sites.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 28% | +1.7 |
Compile and write documentation of program development and subsequent revisions, inserting comments in the coded instructions so others can understand the program.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 55% | +3.3 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 30% | 28% | +8.4 |
| Total | 100% | 31% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- write code
- programming
- software development
- coding
- debug code
- computer programming
- decentralized application frameworks
- blockchain openness
- software components libraries
- ICT debugging tools
Sources for this job· O*NET 15-1251.00· ESCO/ISCO 2512
IS WORK OVER?
Power-plant operator
19%
#512 / 623
View rankingPower-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-point, parameters and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Room, alarms and the one that trips.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Start, stop and not skipping the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, isolation and the permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the grid and not forcing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The set-point, and not tripping.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set-points
- control room
- plant SOP
- starts
- isolations
- alarms
- dispatch
- the grid
Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131