Automation index
How much of a Kayak guide’s job can AI already do?
A flow report comes earlier. Taking the group without flipping in the rapid do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Kayak guide
19%
AI can already do 19% of this job.
#497 / 633
View rankingKayak guide
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, kit and the briefing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Water, the novice and the one who flips.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Rescue, the rope and not losing anyone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rapid, the yes or no and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The cold, the wetsuit and not pushing the grade.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Without flipping the group, and whole to the take-out.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- flow
- river rescue
- rapids
- wetsuit
- kayak novices
- rope
- river briefing
- flip
Sources for this job· O*NET 39-7011.00· ESCO/ISCO 5113
IS WORK OVER?
Electrical engineer
25%
#236 / 633
View rankingElectrical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, single-line diagram and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Project, quantities and electrical spec.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Site, contractors and commissioning.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Measurements, thermography and faults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Code, quality and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign and own the installation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install wiring
- electrical panels
- repair faults
- Project, quantities and electrical spec
- Site, contractors and commissioning
- Measurements, thermography and faults
- Code, quality and documentation
- Sign and own the installation
- ingeniero electrico
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151