IS WORK OVER?

Automation index

How much of a Kayak guide’s job can AI already do?

A flow report comes earlier. Taking the group without flipping in the rapid do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Kayak guide

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, kit and the briefing.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Water, the novice and the one who flips.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Rescue, the rope and not losing anyone.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rapid, the yes or no and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The cold, the wetsuit and not pushing the grade.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Without flipping the group, and whole to the take-out.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • flow
  • river rescue
  • rapids
  • wetsuit
  • kayak novices
  • rope
  • river briefing
  • flip

Sources for this job· O*NET 39-7011.00· ESCO/ISCO 5113

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 504Swimming coach19%
  2. 505Tennis coach19%
  3. 506Stucco artist19%
  4. 508Mountain guide19%
  5. 509Farrier19%
  6. 510Blacksmith19%