IS WORK OVER?

Automation index

How much of a Key account manager’s job can AI already do?

A QBR comes earlier. Growing the account without losing it at renewal do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Key account manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Account, plan and the QBR.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Buyer, objections and the one who changes.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Forecast, the gap and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incident, the SLA and not hiding the fail.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Internal, the one who does not deliver and fighting it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Grow it, and not losing it at renewal.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • QBR
  • account plans
  • account forecast
  • SLA
  • renewal
  • buyers
  • objections
  • gaps

Sources for this job· O*NET 41-4012.00· ESCO/ISCO 2433

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Analyse my job

Jobs with similar scores

  1. 163Renewables engineer27%
  2. 164Hydraulic engineer27%
  3. 165Textile engineer27%
  4. 167Linguist27%
  5. 168Nuclear medicine physician27%
  6. 169Office manager27%