IS WORK OVER?

Automation index

How much of a Key account manager’s job can AI already do?

A QBR comes earlier. Growing the account without losing it at renewal do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Key account manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Account, plan and the QBR.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Buyer, objections and the one who changes.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Forecast, the gap and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Incident, the SLA and not hiding the fail.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Internal, the one who does not deliver and fighting it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Grow it, and not losing it at renewal.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • QBR
  • account plans
  • account forecast
  • SLA
  • renewal
  • buyers
  • objections
  • gaps

Sources for this job· O*NET 41-4012.00· ESCO/ISCO 2433

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Jobs with similar scores

  1. 163Renewables engineer27%
  2. 164Hydraulic engineer27%
  3. 165Textile engineer27%
  4. 167Linguist27%
  5. 168Nuclear medicine physician27%
  6. 169Office manager27%