Automation index
How much of a Kitchen fitter’s job can AI already do?
A 3D plan comes earlier. Doors that shut without showing the misalignment do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Kitchen fitter
20%
AI can already do 20% of this job.
#458 / 633
View rankingKitchen fitter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, measures and the module breakdown.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Level, hang and the plinth that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Worktop, sink and the edge that chips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Appliances, openings and the service visit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the tap change and the extra day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Doors that shut, and not leaving the misalignment.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit kitchens
- level modules
- worktops
- hang units
- plinths
- appliance housings
- sinks
- breakdown
Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115
IS WORK OVER?
EV charger installer
22%
#343 / 633
View rankingEV charger installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Single-line, power and the certificate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Conduit, cable and the board that will not take it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Configure, app and load balancing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Residents, the bay and the neighbour who objects.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The electrical inspection and the inspector.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it charges at night, and not tripping the main.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- EV chargers
- single-line
- load balancing
- electrical certificate
- wire the bay
- charger app
- charge board
- residents
Sources for this job· O*NET 47-2111.00· ESCO/ISCO 7411