IS WORK OVER?

Automation index

How much of a Kitchen fitter’s job can AI already do?

A 3D plan comes earlier. Doors that shut without showing the misalignment do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Kitchen fitter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, measures and the module breakdown.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Level, hang and the plinth that will not reach.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Worktop, sink and the edge that chips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Appliances, openings and the service visit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the tap change and the extra day.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Doors that shut, and not leaving the misalignment.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit kitchens
  • level modules
  • worktops
  • hang units
  • plinths
  • appliance housings
  • sinks
  • breakdown

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Jobs with similar scores

  1. 464Intensivist20%
  2. 465Emergency physician20%
  3. 466Cycle courier20%
  4. 468Neonatologist20%
  5. 469Osteopath20%
  6. 470Skipper20%