Automation index
How much of a Kitchen fitter’s job can AI already do?
A 3D plan comes earlier. Doors that shut without showing the misalignment do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Kitchen fitter
20%
AI can already do 20% of this job.
#458 / 633
View rankingKitchen fitter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, measures and the module breakdown.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Level, hang and the plinth that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Worktop, sink and the edge that chips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Appliances, openings and the service visit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the tap change and the extra day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Doors that shut, and not leaving the misalignment.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit kitchens
- level modules
- worktops
- hang units
- plinths
- appliance housings
- sinks
- breakdown
Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7115
IS WORK OVER?
Process engineer
26%
#205 / 633
View rankingProcess engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
P&IDs, balances and the operating procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, trials and the real bottleneck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, yields and the improvement report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Start-up, shutdown and the shift that skips the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Process safety and the HAZOP that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not overloading the reactor, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- P&IDs
- mass balances
- HAZOP
- plant start-up
- improve yields
- SOP
- bottlenecks
- process safety
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141