Automation index
How much of a Kitchen porter’s job can AI already do?
An order and a mise come earlier. Service, and not slowing the brigade, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Kitchen porter
17%
AI can already do 17% of this job.
#586 / 633
View rankingKitchen porter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Orders, mise en place and labelling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Peel, cut, wash and restock.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 10% | +2.4 |
Service, passes and not getting in the way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Hygiene, HACCP and waste.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Shifts, stoves and heat.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not cutting yourself or leaving a pot unwashed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cook
- mise en place
- dishes
- bake
- Orders, mise en place and labelling
- Peel, cut, wash and restock
- Service, passes and not getting in the way
- Hygiene, HACCP and waste
- Shifts, stoves and heat
- ayudante de cocina
Sources for this job· O*NET 35-2021.00· ESCO/ISCO 9412
IS WORK OVER?
Mining engineer
22%
#341 / 633
View rankingMining engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model deposit, blast and rates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Drawings, permits and mining plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Face, safety and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Plant, contractors and output.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Restoration, waste and regulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not leaving a miner below.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model deposit, blast and rates
- Drawings, permits and mining plans
- Face, safety and ventilation
- Plant, contractors and output
- Restoration, waste and regulation
- Not leaving a miner below
- ingeniero de minas
- mining engineer
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146