Automation index
How much of a Kitchen porter’s job can AI already do?
An order and a mise come earlier. Service, and not slowing the brigade, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Kitchen porter
17%
AI can already do 17% of this job.
#696 / 743
View rankingKitchen porter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Orders, mise en place and labelling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Peel, cut, wash and restock.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 10% | +2.4 |
Service, passes and not getting in the way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Hygiene, HACCP and waste.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Shifts, stoves and heat.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not cutting yourself or leaving a pot unwashed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cook
- mise en place
- dishes
- bake
- Orders, mise en place and labelling
- Peel, cut, wash and restock
- Service, passes and not getting in the way
- Hygiene, HACCP and waste
- Shifts, stoves and heat
- ayudante de cocina
Sources for this job· O*NET 35-2021.00· ESCO/ISCO 9412
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142