Automation index
How much of a Kitchen porter’s job can AI already do?
An order and a mise come earlier. Service, and not slowing the brigade, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Kitchen porter
17%
AI can already do 17% of this job.
#596 / 643
View rankingKitchen porter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Orders, mise en place and labelling.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Peel, cut, wash and restock.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 10% | +2.4 |
Service, passes and not getting in the way.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Hygiene, HACCP and waste.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Shifts, stoves and heat.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not cutting yourself or leaving a pot unwashed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cook
- mise en place
- dishes
- bake
- Orders, mise en place and labelling
- Peel, cut, wash and restock
- Service, passes and not getting in the way
- Hygiene, HACCP and waste
- Shifts, stoves and heat
- ayudante de cocina
Sources for this job· O*NET 35-2021.00· ESCO/ISCO 9412
IS WORK OVER?
Renewables engineer
27%
#165 / 643
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149