IS WORK OVER?

Automation index

How much of a Labour inspector’s job can AI already do?

A site checklist comes earlier. Stopping the job and issuing the penalty do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Labour inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan visits, complaints and the firm’s history.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Site or workplace, stop unsafe work and take statements.
Estimate

No public source provides a precise figure. This is our estimate.

22%12%+2.6
Minutes, orders and the penalty proposal.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Contracts, hours and the bogus self-employed.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Union, employer and what is argued in the corridor.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
A penalty that holds, and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • visit sites
  • stop unsafe work
  • infringement minutes
  • bogus self-employment
  • check contracts
  • labour orders
  • fine firms
  • take statements

Sources for this job· O*NET 13-1041.00· ESCO/ISCO 3352

Aerospace technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bench, the protocol and the torque.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Part, the lockwire and the one left loose.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
NDT, the crack and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Engine, the run and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The engineer, the rush and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Torque it, and not leaving the lockwire loose.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test bench
  • torque
  • lockwire
  • aerospace NDT
  • engine runs
  • protocols
  • cracks
  • not sign half done

Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115

Analyse my job

Jobs with similar scores

  1. 335Geologist23%
  2. 336Haematologist23%
  3. 337Infectious disease physician23%
  4. 339Alarm installer23%
  5. 340Home-automation installer23%
  6. 341Station master23%