IS WORK OVER?

Automation index

How much of a Labour inspector’s job can AI already do?

A site checklist comes earlier. Stopping the job and issuing the penalty do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Labour inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan visits, complaints and the firm’s history.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Site or workplace, stop unsafe work and take statements.
Estimate

No public source provides a precise figure. This is our estimate.

22%12%+2.6
Minutes, orders and the penalty proposal.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Contracts, hours and the bogus self-employed.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Union, employer and what is argued in the corridor.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
A penalty that holds, and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • visit sites
  • stop unsafe work
  • infringement minutes
  • bogus self-employment
  • check contracts
  • labour orders
  • fine firms
  • take statements

Sources for this job· O*NET 13-1041.00· ESCO/ISCO 3352

CNC machinist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Program, simulate and document the cycle.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Work orders, paper metrology and batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Set up, set zeros and start.
Estimate

No public source provides a precise figure. This is our estimate.

20%14%+2.8
Measure, adjust and not break a tool.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Maintenance, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Talk to engineering when the drawing lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Program, simulate and document the cycle
  • Work orders, paper metrology and batches
  • Set up, set zeros and start
  • Measure, adjust and not break a tool
  • Maintenance, swarf and safety
  • Talk to engineering when the drawing lies
  • cnc
  • operario cnc
  • fresador
  • tornero cnc

Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223

Analyse my job

Jobs with similar scores

  1. 301Geologist23%
  2. 302Haematologist23%
  3. 303Infectious disease physician23%
  4. 305Alarm installer23%
  5. 306Home-automation installer23%
  6. 307Station master23%