IS WORK OVER?

Automation index

How much of a Landscape architect’s job can AI already do?

A planting plan comes earlier. A garden you can live in that does not die in August do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Landscape architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, species and the irrigation.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Works, levels and the tree that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Soil, climate and not planting what will not last.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Client, maintenance and what they will not water.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
August, the drought and the yes to xeriscape.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it is lived in, and not dying in August.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • planting plans
  • species
  • garden irrigation
  • xeriscape
  • works levels
  • soil
  • garden maintenance
  • trees

Sources for this job· O*NET 17-1012.00· ESCO/ISCO 2162

Aerospace technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bench, the protocol and the torque.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Part, the lockwire and the one left loose.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
NDT, the crack and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Engine, the run and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The engineer, the rush and not signing half done.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Torque it, and not leaving the lockwire loose.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • test bench
  • torque
  • lockwire
  • aerospace NDT
  • engine runs
  • protocols
  • cracks
  • not sign half done

Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115

Analyse my job

Jobs with similar scores

  1. 313Neurologist24%
  2. 314CNC machinist24%
  3. 315Factory operator24%
  4. 317University professor24%
  5. 318Judicial secretary24%
  6. 319Property valuer24%