IS WORK OVER?

Automation index

How much of a Landscape architect’s job can AI already do?

A planting plan comes earlier. A garden you can live in that does not die in August do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Landscape architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, species and the irrigation.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Works, levels and the tree that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Soil, climate and not planting what will not last.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Client, maintenance and what they will not water.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
August, the drought and the yes to xeriscape.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it is lived in, and not dying in August.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • planting plans
  • species
  • garden irrigation
  • xeriscape
  • works levels
  • soil
  • garden maintenance
  • trees

Sources for this job· O*NET 17-1012.00· ESCO/ISCO 2162

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 274Neurologist24%
  2. 275CNC machinist24%
  3. 276Factory operator24%
  4. 278University professor24%
  5. 279Judicial secretary24%
  6. 280Property valuer24%