IS WORK OVER?

Automation index

How much of a Lathe operator’s job can AI already do?

A CNC run and a pass come earlier. Setting up, measuring and not scrapping the part do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Lathe operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the drawing, tolerances and the route card.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Set up, clamp, pick the tool and the origin.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Turn, face, thread and finish the part.
Estimate

No public source provides a precise figure. This is our estimate.

18%28%+5
Measure, tweak offsets and not scrap the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Lathe care, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Grades, times and liability for the dimension.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • turn parts
  • set up the lathe
  • measure dimensions
  • cut threads
  • adjust offsets
  • read mechanical drawings
  • avoid scrap
  • pick tools

Sources for this job· O*NET 51-4034.00· ESCO/ISCO 7223

Cloud architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, ADRs and a first IaC pass.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 211Last-mile manager26%
  2. 212Development cooperation officer26%
  3. 213NGO programme officer26%
  4. 215Archivist25%
  5. 216Boilermaker25%
  6. 217CISO25%