IS WORK OVER?

Automation index

How much of a Lathe operator’s job can AI already do?

A CNC run and a pass come earlier. Setting up, measuring and not scrapping the part do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Lathe operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the drawing, tolerances and the route card.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Set up, clamp, pick the tool and the origin.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Turn, face, thread and finish the part.
Estimate

No public source provides a precise figure. This is our estimate.

18%28%+5
Measure, tweak offsets and not scrap the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Lathe care, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Grades, times and liability for the dimension.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • turn parts
  • set up the lathe
  • measure dimensions
  • cut threads
  • adjust offsets
  • read mechanical drawings
  • avoid scrap
  • pick tools

Sources for this job· O*NET 51-4034.00· ESCO/ISCO 7223

Doula

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, expectations and what cannot be.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Labour, the house and the one that runs long.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Delivery room, the position and the one who asks for an epidural.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Puerperium, the breast and the come-down.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The midwife, the line and not playing clinician.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Be there, and not replacing the midwife.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • birth plan
  • labour support
  • puerperium
  • breastfeeding
  • positions
  • delivery room
  • not replace the midwife
  • expectations

Sources for this job· O*NET 31-9099.00· ESCO/ISCO 5322

Analyse my job

Jobs with similar scores

  1. 217Last-mile manager26%
  2. 218Development cooperation officer26%
  3. 219NGO programme officer26%
  4. 221Archivist25%
  5. 222Boilermaker25%
  6. 223CISO25%