IS WORK OVER?

Automation index

How much of a Lathe operator’s job can AI already do?

A CNC run and a pass come earlier. Setting up, measuring and not scrapping the part do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Lathe operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the drawing, tolerances and the route card.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Set up, clamp, pick the tool and the origin.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Turn, face, thread and finish the part.
Estimate

No public source provides a precise figure. This is our estimate.

18%28%+5
Measure, tweak offsets and not scrap the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Lathe care, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Grades, times and liability for the dimension.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • turn parts
  • set up the lathe
  • measure dimensions
  • cut threads
  • adjust offsets
  • read mechanical drawings
  • avoid scrap
  • pick tools

Sources for this job· O*NET 51-4034.00· ESCO/ISCO 7223

PLC programmer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Ladder, tags and the comment.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cell, the fault and the one that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
E-stop, the cable and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Recipe, the change and not dumping production.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrician, the terminals and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it stops on a fault, and not jumping the e-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • tags
  • e-stops
  • faults
  • recipes
  • terminals
  • program comments
  • not jump e-stops

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 247Last-mile manager26%
  2. 248Development cooperation officer26%
  3. 249NGO programme officer26%
  4. 251Archivist25%
  5. 252Boilermaker25%
  6. 253CISO25%