IS WORK OVER?

Automation index

How much of a Lathe operator’s job can AI already do?

A CNC run and a pass come earlier. Setting up, measuring and not scrapping the part do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Lathe operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the drawing, tolerances and the route card.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Set up, clamp, pick the tool and the origin.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Turn, face, thread and finish the part.
Estimate

No public source provides a precise figure. This is our estimate.

18%28%+5
Measure, tweak offsets and not scrap the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Lathe care, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Grades, times and liability for the dimension.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • turn parts
  • set up the lathe
  • measure dimensions
  • cut threads
  • adjust offsets
  • read mechanical drawings
  • avoid scrap
  • pick tools

Sources for this job· O*NET 51-4034.00· ESCO/ISCO 7223

Substation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Switching, the sheet and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bay, the earth and not going in without it.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Oil, the analysis and the one that bites.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fault, the disconnector and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Control and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Open the right one, and not going in unearthed.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switching
  • substation sheets
  • earths
  • bays
  • oil
  • lockouts
  • disconnectors
  • not go in unearthed

Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 250Last-mile manager26%
  2. 251Development cooperation officer26%
  3. 252NGO programme officer26%
  4. 254Archivist25%
  5. 255Boilermaker25%
  6. 256CISO25%