Automation index
How much of a Lathe operator’s job can AI already do?
A CNC run and a pass come earlier. Setting up, measuring and not scrapping the part do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Lathe operator
26%
AI can already do 26% of this job.
#214 / 633
View rankingLathe operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read the drawing, tolerances and the route card.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Set up, clamp, pick the tool and the origin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Turn, face, thread and finish the part.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 28% | +5 |
Measure, tweak offsets and not scrap the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Lathe care, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grades, times and liability for the dimension.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- turn parts
- set up the lathe
- measure dimensions
- cut threads
- adjust offsets
- read mechanical drawings
- avoid scrap
- pick tools
Sources for this job· O*NET 51-4034.00· ESCO/ISCO 7223
IS WORK OVER?
Tool and die maker
25%
#244 / 633
View rankingTool and die maker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read the die, clearances and the 3D drawing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Machine, fit and try the tooling.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Mount in the press, shoot and correct.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
EDM, polish and cavity finish.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Die maintenance and changeovers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Die life and liability for the part.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make dies
- fit tooling
- run EDM
- try out tooling
- polish cavities
- mount in the press
- maintain moulds
- correct clearances
Sources for this job· O*NET 51-4111.00· ESCO/ISCO 7222