IS WORK OVER?

Automation index

How much of a Lathe operator’s job can AI already do?

A CNC run and a pass come earlier. Setting up, measuring and not scrapping the part do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Lathe operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read the drawing, tolerances and the route card.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Set up, clamp, pick the tool and the origin.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Turn, face, thread and finish the part.
Estimate

No public source provides a precise figure. This is our estimate.

18%28%+5
Measure, tweak offsets and not scrap the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Lathe care, swarf and safety.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Grades, times and liability for the dimension.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • turn parts
  • set up the lathe
  • measure dimensions
  • cut threads
  • adjust offsets
  • read mechanical drawings
  • avoid scrap
  • pick tools

Sources for this job· O*NET 51-4034.00· ESCO/ISCO 7223

Tower crane operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Radius, winds and the day’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Hoist, trolley and the slinger’s call.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Erect, climb and the base that is checked.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Two-crane lifts and crossing jibs.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The wind that gets up and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sweep nobody, and not pushing the radius.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tower-crane lifts
  • load charts
  • climb the crane
  • slinger’s call
  • jib wind
  • crossing jibs
  • crane base
  • trolley

Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343

Analyse my job

Jobs with similar scores

  1. 211Last-mile manager26%
  2. 212Development cooperation officer26%
  3. 213NGO programme officer26%
  4. 215Archivist25%
  5. 216Boilermaker25%
  6. 217CISO25%