Automation index
How much of a Leisure instructor’s job can AI already do?
An activity and a list come earlier. Holding twenty kids and nobody getting hurt does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Leisure instructor
17%
AI can already do 17% of this job.
#724 / 763
View rankingLeisure instructor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan activities, lists and permission slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Lead the group, games and trips.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Handle fights, fears and parents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, photos and camp report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Kit, meals and nights.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Not losing a child or missing an allergy.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Lead the group, games and trips
- Handle fights, fears and parents
- Logs, photos and camp report
- Kit, meals and nights
- Not losing a child or missing an allergy
- monitor de ocio
- leisure instructor
Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3423
IS WORK OVER?
Requirements engineer
27%
#187 / 763
View rankingRequirements engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Workshop, the actor and the requirement.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Conflict, the loudest and not swallowing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Criterion, the test and not leaving it vague.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Change, the impact and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The project lead, the deadline and not cutting the one that matters.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it is needed, and not the loudest one's.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- requirements
- actor workshops
- acceptance criteria
- change impact
- backlog
- tests
- not swallow the loudest
- ambiguity
Sources for this job· O*NET 15-1299.00· ESCO/ISCO 2511