IS WORK OVER?

Automation index

How much of a Lift technician’s job can AI already do?

A fault code comes earlier. Going into the shaft and getting the person out do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Lift technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagnosis, codes and the lift history.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Shaft, pit and the cabin rescue.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Service, tensioning and the industry report.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Modernise, doors and the limit switch.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The residents, the porter and the night fault.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get the person out, and sign the service.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cabin rescue
  • service lifts
  • tension cables
  • fault codes
  • shaft pit
  • cabin doors
  • industry report
  • modernise lifts

Sources for this job· O*NET 47-4021.00· ESCO/ISCO 7412

Power engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Study, the short-circuit and selectivity.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Substation, the disconnector and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Switching, the five rules and not skipping them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fault, the relay and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not blow, and not working live.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • short-circuits
  • selectivity
  • disconnectors
  • five rules
  • relays
  • substations
  • lockouts
  • not work live

Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151

Analyse my job

Jobs with similar scores

  1. 553Harbour pilot20%
  2. 554Chiropractor20%
  3. 555Cabin manager20%
  4. 557Boiler technician20%
  5. 558Sonographer20%
  6. 559Radiographer20%