IS WORK OVER?

Automation index

How much of a Linguist’s job can AI already do?

A corpus comes earlier. Describing the language without over-prescribing do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Linguist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Corpus, glosses and the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Field, the speaker and the one who will not.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Report, the variety and not dismissing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Teach, the standard and not humiliating.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The job, the rush and not faking the figure.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Describe, and not over-prescribing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • corpus
  • glosses
  • varieties
  • speakers
  • the standard
  • linguistic fieldwork
  • analysis
  • not over-prescribe

Sources for this job· O*NET 19-3099.00· ESCO/ISCO 2643

Bridge engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, loads and the span.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Works, the prestress and the one who did not tension.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Inspection, the crack and not looking away.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Traffic, the closure and not leaving the village hanging.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it takes the lorry, and not signing the crack.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • spans
  • prestress
  • cracks
  • bridge inspection
  • loads
  • traffic closures
  • structural models
  • tensioning

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 182Schools inspector27%
  2. 183Data protection inspector27%
  3. 184Key account manager27%
  4. 186Magistrate27%
  5. 187Aviation medical examiner27%
  6. 188Nuclear medicine physician27%