Automation index
How much of a Livestock farmer’s job can AI already do?
A headcount and a ration come earlier. The animal whole and the calving coming out do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Livestock farmer
21%
AI can already do 21% of this job.
#499 / 733
View rankingLivestock farmer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Headcount, ration and the health log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Yard, calving and the one that lags.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Pasture, water and the fence that comes down.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Market, abattoir and the day’s price.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The drought, the feed and not running them too thin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The animal whole, and the calving well.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- rations
- calving
- headcount
- fences
- pasture
- abattoir
- health log
- feed
Sources for this job· O*NET 45-1011.00· ESCO/ISCO 6121
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142