IS WORK OVER?

Automation index

How much of a Livestock farmer’s job can AI already do?

A headcount and a ration come earlier. The animal whole and the calving coming out do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Livestock farmer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Headcount, ration and the health log.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Yard, calving and the one that lags.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Pasture, water and the fence that comes down.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Market, abattoir and the day’s price.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The drought, the feed and not running them too thin.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The animal whole, and the calving well.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • rations
  • calving
  • headcount
  • fences
  • pasture
  • abattoir
  • health log
  • feed

Sources for this job· O*NET 45-1011.00· ESCO/ISCO 6121

Building surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Quantities, valuations and cost control.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Working drawings and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, visits and safety.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Client, contractor and site team.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, tests and the building book.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign a build that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Quantities, valuations and cost control
  • Working drawings and trade coordination
  • Site, visits and safety
  • Client, contractor and site team
  • Quality, tests and the building book
  • Sign a build that will not fall
  • arquitecto tecnico

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112

Analyse my job

Jobs with similar scores

  1. 426Driving examiner21%
  2. 427Façade technician21%
  3. 428Physiotherapist21%
  4. 430Gynaecologist21%
  5. 431Executive housekeeper21%
  6. 432Illustrator21%