Automation index
How much of a Livestock farmer’s job can AI already do?
A headcount and a ration come earlier. The animal whole and the calving coming out do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Livestock farmer
21%
AI can already do 21% of this job.
#420 / 633
View rankingLivestock farmer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Headcount, ration and the health log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Yard, calving and the one that lags.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Pasture, water and the fence that comes down.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Market, abattoir and the day’s price.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The drought, the feed and not running them too thin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The animal whole, and the calving well.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- rations
- calving
- headcount
- fences
- pasture
- abattoir
- health log
- feed
Sources for this job· O*NET 45-1011.00· ESCO/ISCO 6121
IS WORK OVER?
Process engineer
26%
#205 / 633
View rankingProcess engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
P&IDs, balances and the operating procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, trials and the real bottleneck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, yields and the improvement report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Start-up, shutdown and the shift that skips the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Process safety and the HAZOP that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not overloading the reactor, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- P&IDs
- mass balances
- HAZOP
- plant start-up
- improve yields
- SOP
- bottlenecks
- process safety
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141