Automation index
How much of a Livestock farmer’s job can AI already do?
A headcount and a ration come earlier. The animal whole and the calving coming out do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Livestock farmer
21%
AI can already do 21% of this job.
#499 / 733
View rankingLivestock farmer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Headcount, ration and the health log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Yard, calving and the one that lags.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Pasture, water and the fence that comes down.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Market, abattoir and the day’s price.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The drought, the feed and not running them too thin.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The animal whole, and the calving well.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- rations
- calving
- headcount
- fences
- pasture
- abattoir
- health log
- feed
Sources for this job· O*NET 45-1011.00· ESCO/ISCO 6121
IS WORK OVER?
Safety engineer
22%
#388 / 733
View rankingSafety engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
HAZOP, nodes and the minute.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the scenario and the one that was not thought.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
SIL, the valve and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Incident, the lesson and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Management, the cost and not yielding the interlock.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop, and not signing the risk that kills.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- HAZOP
- nodes
- SIL
- safety valves
- incidents
- interlocks
- safety minutes
- not jump
Sources for this job· O*NET 17-2111.00· ESCO/ISCO 2141