IS WORK OVER?

Automation index

How much of a Locksmith’s job can AI already do?

Ordering a cylinder from a photo is easy. Opening a door at 3 a.m. without wrecking it is not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Locksmith

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Emergency diary, quotes and invoices.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Diagnose lock, cylinder and possible pick.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Opening, cylinder swap and fitting.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Fit electronic locks and access control.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Cut keys and manage master systems.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Helping a client in trouble, and travel.
Estimate

No public source provides a precise figure. This is our estimate.

12%18%+2.2
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Emergency diary, quotes and invoices
  • Diagnose lock, cylinder and possible pick
  • Opening, cylinder swap and fitting
  • Fit electronic locks and access control
  • Cut keys and manage master systems
  • Helping a client in trouble, and travel
  • cerrajer
  • locksmith
  • apertura de puertas

Sources for this job· O*NET 49-9094.00· ESCO/ISCO 7222

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 746Plasterer16%
  2. 747Mason15%
  3. 748Referee15%
  4. 750Bus driver15%
  5. 751Professional athlete15%
  6. 752Early childhood educator15%