IS WORK OVER?

Automation index

How much of a Locksmith’s job can AI already do?

Ordering a cylinder from a photo is easy. Opening a door at 3 a.m. without wrecking it is not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Locksmith

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Emergency diary, quotes and invoices.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Diagnose lock, cylinder and possible pick.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Opening, cylinder swap and fitting.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Fit electronic locks and access control.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Cut keys and manage master systems.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Helping a client in trouble, and travel.
Estimate

No public source provides a precise figure. This is our estimate.

12%18%+2.2
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Emergency diary, quotes and invoices
  • Diagnose lock, cylinder and possible pick
  • Opening, cylinder swap and fitting
  • Fit electronic locks and access control
  • Cut keys and manage master systems
  • Helping a client in trouble, and travel
  • cerrajer
  • locksmith
  • apertura de puertas

Sources for this job· O*NET 49-9094.00· ESCO/ISCO 7222

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 626Plasterer16%
  2. 627Mason15%
  3. 628Referee15%
  4. 630Bus driver15%
  5. 631Professional athlete15%
  6. 632Early childhood educator15%