Automation index
How much of a Logistics analyst’s job can AI already do?
A cost dashboard comes earlier. Finding the saving without breaking the network do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Logistics analyst
28%
AI can already do 28% of this job.
#79 / 623
View rankingLogistics analyst
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Costs, OTIF and the dashboard.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Simulate network, warehouses and the what-if.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Ops, dirty data and going down to the dock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, the board and the cut that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The haulier, the contract and not breaking the service.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
A real saving, and not dressing OTIF.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- logistics costs
- OTIF
- simulate network
- what-if
- dirty data
- haulage contracts
- dashboards
- network cuts
Sources for this job· O*NET 13-1081.00· ESCO/ISCO 2421
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142